Located in Manisa, in Rapro Kimya Turizm Bilişim SAN. ve TİC. A.Ş. plant, the organization preparations on 20.10.2019 and the organizational studies that were trained on 10.11.2019 were successful and majority determination application was made on 11.11.2019. On 06.12.2019, our union received a positive authorization letter. After the lawsuit filed against the labor court as a result of the objection made by the employer, the employer was warned by our union Lastik-İş with a letter signed by our President Alaaddin Sarı. For the same purpose, our global union IndustriALL contributed to this process with its objection. It reported the protest of our members to the employer and stressed that we should sit at the solution desk.
Related Documents
→ IndustriALL Global Union’s Letter to Gates Corporation and Rapro Kimya 22-01-2020